« Previous    1 2 3 4 5 6    Next »
 
 Þ Step Three  -  Day 2
 
  • Set new bath.
  • Repair water damaged timber.
  • Sheet up wall with new sheeting.
 
  
 
 
 
Copyright © 2004-2009 Adorn Tiles Pty Ltd      Lic No. 68955C